Smashing into Summer

As this article is being typed, our countdown clock has 11 days remaining. We were hoping to beat the clock, but there were challenges with the roof that were not easily solved. We have the electrical remaining, installing the A/C, running the remaining insulation, and then one last pass on cleaning up the floor.

Today we were able to get the 6 work stations painted. Thanks Keith for stripping and getting the paint. Thanks Gene for cleaning and painting. Thanks Mark for painting like a pro. Thanks Dru for cleaning.

We were able to get the leak situation addressed. Thanks Jackie and Dru.

Leave a Reply